Professional project review
Give us the geometry, interfaces and programme. We’ll help define the curtain package.
A useful first review does not need a finished specification. We can start from drawings, photographs and project constraints, then identify the information still needed to resolve track route, fixing conditions, curtain stack, heading, fabric/lining implications and installation access.
Recommended project brief
Information that makes the first review faster
Your role: architect, interior designer, developer, housebuilder, contractor or fit-out team
Project location and current project stage
Window type, aperture geometry and approximate dimensions
Number of openings or plots involved
Available drawings, elevations, sections or window schedules
Preferred heading, face fabric, lining or visual intent if already defined
Proposed track position: ceiling, wall or recess
Known fixing substrate or construction build-up at track level
Required operation, stack-back and clear-opening requirements
Access constraints, double-height areas or working-at-height considerations
Target survey, manufacture and installation dates