For contractors & fit-out teams

Coordinate the fixing, access and sequence before the specialist installation arrives on site.

Specialist curtain systems interface with ceilings, walls, recesses, glazing, joinery, services and finished interiors. We work with contractors and fit-out teams to clarify substrate, fixing zones, access, programme and protection requirements before installation starts.

Substrate & fixing zones

Track performance depends on a suitable fixing condition. We can flag where the proposed location needs confirmation of timber, steel, concrete, pattressing or another appropriate substrate rather than relying on decorative finishes alone.

Access methodology

Double-height and difficult-to-reach installations need safe access planned around the finished space. We can coordinate survey and installation requirements so towers, podiums or other access methods are considered in the programme and logistics plan.

Interfaces & sequencing

Track installation can conflict with lighting, sprinklers, ceiling features, joinery and glazing trims. Early coordination reduces late drilling, remedial work and avoidable snagging around completed finishes.

Specification inputs

What we can work from

Relevant construction details and reflected ceiling plans
Confirmation of proposed fixing substrate and build-up
Site logistics and access information
Programme dates and readiness milestones
Site-specific induction, permit or RAMS requirements where applicable
Coordination points

Issues to resolve before manufacture

Track centreline relative to glazing, ceiling and wall finishes
Suitable fixing zone and substrate continuity
Services and obstructions along the proposed track route
Access equipment, exclusion zones and protection of finishes
Final survey, manufacture release, installation and snagging sequence
Contractor and fit-out project support

Bring us in before the curtain specification becomes a site problem.

Early coordination can clarify track route, fixing substrate, recess or ceiling interface, curtain stack-back, heading, face fabric, lining, finished drop, access strategy and installation sequencing before manufacture is released.